every tree installation
August 8th, 2015During the first week in August, I spent the majority of my time installing every tree in the Hand Art Center. Below is a selection of images that I posted to social media to share the installation process with others along the way. Many thanks for the HAC staff for their assistance with the painting. This project will be open to the public on August 14.
- Hanging the center circle.
- Laser level to ensure straight lines.
- Finalizing tape with the lift.
- HAC staff assisting with the paint.
- Painting a coat of grey.
- Finished painting the grey.
- Starting to pull the tape.
- After pulling the tape.
- Wiring the headphones.
- Wiring the box.
- Testing the headphones.
- Finished installation.
Leave a Reply